System Maintenance: Starting on Saturday, April 20th from 7 PM to Sunday, April 21st at 4 AM, we will be performing maintenance on our systems. During this time, Manage My Account, all other web portals, customer alert notifications, and our automated phone system will be unavailable. EZ Pay credit card payment processing and visibility to bills in Manage My Account will be unavailable until Sunday, April 20th at 5 AM. We will still be able to process emergency gas and electric requests by calling 210-353-HELP (4357) or 1-800-870-1006.
Operating Criteria
CPS Energy, as the owner and operator of a CCR unit, provides the following documentation.
Links to Documentation
- Calaveras 2023 Annual Face-to-Face
- Calaveras CCR Units 2023 Annual Inspection
- Calaveras CCR Emergency Action Plan August 2023
- Calaveras SRH Pond Alternative to Initiate Closure Update
- CCR Fugitive Dust Control Plan August 2023
- Calaveras 2022 Annual Face-to-Face
- Owners Certificate for PDP
- Calaveras CCR Units 2022 Annual Inspection
- CPS Energy Comments and Responses to the Proposed Conditional Approval from EPA
- EPA Calaveras Proposed Decision
- Calaveras 2021 Annual Face-to-Face
- Response EPA RFI - Calaveras ACID Status & Dates
- Calaveras CCR Units 2021 Annual Inspection
- Calaveras Power Station Completeness Letter
- Calaveras Run-On Run-Off Control Plan - 5 Year Update (2021)
- Calaveras 2020 Annual Face-to-Face
- Calaveras CCR Units 2020 Annual Inspection
- Alternative Capacity Infeasibility Demonstration Application - EP Pond
- Alternative Capacity Infeasibility Demonstration Application - SRH Pond
- Calaveras Annual Face to Face 2019
- Calaveras CCR Units 2019 Annual Inspection A9984
- Calaveras 2018 Annual Face-to-Face
- Calaveras Power Station – 2018 Annual Inspection Report
- Calaveras 2017 Annual Face-to-Face
- Calaveras Power Station – 2017 Annual Inspection Report
- Calaveras 2016 Annual Fugitive Dust Control
- Calaveras Power Station CCR Units EAP
- Calaveras Power Station - 2016 Annual Inspection Report
- Calaveras Power Station - 2015 Annual Inspection Report
- CCR Fugitive Dust Control Plan - Calaveras Power Station
- Calaveras Run-On Run-Off Control Plan