Service Disconnections for non-payment resumes in September as we move toward normal business operations. Read more here  If you are experiencing financial hardship, we urge you to contact us for help. Call us at 210-353-2222 or online at cpsenergy.com/assistance. Stay up to date by following us on Facebook and Twitter.  More info: NewsroomStorm Updates & Events

We encourage the use of a face-covering at any CPS Energy facility. Our customer service center hours are 7:45 AM to 5:00 PM Monday-Friday. If you have tested positive, or a family member has tested positive for COVID-19 in the last 14 days, please use our online tools or call 210-353-2222 for assistance.  Please do not visit our customer service center if you have COVID-19 symptoms.

Hunt Lane to Pinn Road Transmission Line Rebuild Project

 

CPS Energy is planning to rebuild an existing double circuit 138 kV transmission line between the Hunt Lane and Pinn Road substations. The transmission line route will be approximately four miles long and begins near the existing Hunt Lane Substation near the intersection of Marbach Road and Hunt Lane.

The project will involve a complete rebuild of the transmission line including foundations, transmission structures (poles) and electrical wires.  CPS Energy plans to replace the transmission line along the existing route. However, there will be a change in the type of structures. The existing lattice (webbed) structures will be replaced with steel poles.

The project is scheduled for completion in June 2017.

For more information, contact:

CPS Energy
Kevin Phillips, Project Manager
Hunt Lane to Pinn Rd. Transmission Line Rebuild Project
Mail Code 111008
P.O. Box 1771
San Antonio, Texas 78296-1771
(210) 353-2923