Service Disconnections for non-payment resumed in September as we move toward normal business operations. Read more here  If you are experiencing financial hardship, we urge you to contact us for help. Call us at 210-353-2222 or online at cpsenergy.com/assistance. Stay up to date by following us on Facebook and Twitter.  More info: NewsroomStorm Updates & Events

We encourage the use of a face-covering at any CPS Energy facility. Our customer service center hours are 7:45 AM to 5:00 PM Monday-Friday. If you have tested positive, or a family member has tested positive for COVID-19 in the last 14 days, please use our online tools or call 210-353-2222 for assistance.  Please do not visit our customer service center if you have COVID-19 symptoms.

Hunt Lane to Pinn Road Transmission Line Rebuild Project

 
 

The Hunt Lane to Pinn Road Transmission Line Rebuild project involves replacing existing 138kV transmission (power) line structures between our Hunt Lane and Pinn Road substations. The transmission line route is approximately 2 miles long and begins at the Pinn Road substation, near the intersection of Pinn Rd. and Westlawn Dr. The line proceeds west from the substation along the existing transmission Right-of-Way. The route crosses Military Dr., SW Loop 410, Adams Hill Dr. and Hunt Ln., before ending at the Hunt Lane substation, near the intersection of Hunt Ln. and Marbach Rd.

This project will improve the quality and safety of an aging transmission line and will support electric reliability in your neighborhood.

Construction is tentatively scheduled to begin November 15, 2021 and should be completed by April 29, 2022.

Our website will include regular updates on the project as steps are completed.

You may also call, write or email:

CPS Energy
Darcy Ralston, Project Manager
Hunt Lane to Pinn Road Transmission Line Rebuild
500 McCullough Ave.
Mail Drop RT0801
San Antonio, TX 78296
(210) 353-2041
[email protected]