CPS Energy’s offices, customer service centers and call center will be closed Monday, January 21 in observance of Martin Luther King Jr. Day.  During the closure, customers can report natural gas or electric emergencies by calling 210-353-HELP (4357) or 1-800-870-1006 24/7. Social media channels will be monitored for urgent issues.

Southton Substation

 

We are planning to construct a new electric substation and high-voltage transmission line in the southeast area of San Antonio near Southton Rd and IH 410.

A substation is a local power hub or distribution point for electricity. This substation will improve reliability and provide additional electric capacity to homes and businesses in the area. The substation will be supplied from a new extension of an existing high-voltage transmission line illustrated in the Study Area map provided. The substation will supply electric power to homes and businesses in the immediate area through lower-voltage distribution lines. 

The substation requires approximately 6 acres; the transmission right of way would be approximately 100 feet wide.

Construction is expected to begin in early 2018.

Our website will include regular updates on the project as steps are completed. Also, you may call, write or e-mail:

CPS Energy
Basileo Rocha, Project Manager
Southton Substation and Transmission Line Project
Mail Code 100311
PO Box 1771
San Antonio, Texas 78296-1771
210-353-4933