Please note: Our customer service centers are not taking credit cards payments at this time.
To make a payment, you can access Manage My Account or these other Payment Options.

 
Commercial and Industrial Plumbing, Mechanical and Sewer Services

Collective 7000147991

Description: Company shall provide commercial and industrial plumbing, mechanical and sewer Services pursuant to this SOW at various CPS Energy facilities including Power Generation locations. See Addendum G for Power Generation locations.

Solicitation Detail:

Commercial Services.  Company shall furnish all labor, materials, equipment required to provide plumbing and sewer services and repairs, including, but not limited to replacing and repairing fixtures, repairing water lines, water mains, backflow prevention, sprinkler systems, sewer lines and sewer mains on an as needed basis as directed by CPS Energy at various CPS Energy locations. Industrial Services.  Company shall furnish all labor, materials, equipment required to provide plumbing and sewer services and repairs, including, but not limited to replacing and repairing fire water isolation valves, fire hydrants, water lines, water mains, backflow prevention, sprinkler systems, sewer lines, sewer mains and asbestos-cement (transite) piping on an as needed basis as directed by CPS Energy at various CPS Energy Power Generation locations.

Solicitation Documents:

Companies wishing to provide a Response for this Solicitation must download the Collective Document for this Solicitation no later than February 21, 2018 from the website. There is a link for the Collective Document located on the left side of this page, under the “Solicitation Documents.” To successfully download the documents, it is recommended that Google Chrome 33+, Mozilla Firefox 38.01.1, or Internet Explorer 9 or greater be used.

Pre-Solicitation Meeting:

A Non-Mandatory Pre-Solicitation Meeting will be held on February 6, 2018 at 2:00 pm (Central) at EMC Auditorium, 4514 Frank Bryant Lane, San Antonio, Texas 78220. This meeting is not mandatory, however, it is highly recommended that the interested Companies Attend.

Response Due Date:

Responses are due no later than February 22, 2018 at 2:00 pm (Central). CPS Energy reserves the right to reject late Submittals. The Collective Document contains all pertinent information regarding Responses.

Contact Name: Dolores Torres-Elizondo

Contact Email: dtelizondo@CPSEnergy.com