Highland Hills Substation Control House

Collective 7000158128

Description: CPS Energy is seeking a Company to construct a Control House on an existing slab foundation provided by CPS Energy at Highland Hills Substation.

Solicitation Detail:

CPS Energy is seeking a Company to supply all material required and assemble a 32’ x 44’ engineered metal building (i.e., “control house”) on an existing slab foundation provided by CPS Energy at Highland Hills Substation and associated services.       

Solicitation Documents:

Companies wishing to provide a Response for this Solicitation must download the Collective Document for this Solicitation no later than April 8, 2020 from the website. There is a link for the Collective Document located on the left side of this page, under the “Solicitation Documents.” To successfully download the documents, it is recommended that Google Chrome 33+, Mozilla Firefox 38.01.1, or Internet Explorer 9 or greater be used.

Pre-Solicitation Meeting:

A Non-Mandatory Pre-Solicitation Meeting will be held remotely on March 18, 2020 at 10:00 AM (Central) via WebEx. Information for the WebEx meeting will be provided upon receipt of the Acknowledgement of Receipt document embedded in the Collective. This meeting is not mandatory; however, it is highly recommended that the interested companies attend.

Response Due Date:

Responses are due no later than April 9, 2020 at 2:00 PM (Central). CPS Energy reserves the right to reject late Submittals. The Collective Document contains all pertinent information regarding Responses.