Solicitation Documents

 
Spruce Unit 1 Dust Collector 101 Demolition, Removal and Installation Services

Collective 7000153039

Description: Company to provide Spruce Unit 1 Dust Collector 101 Demolition, Removal and Installation Services.

Solicitation Detail:

Company must be able to provide demolition, removal and installation Services for the Spruce Unit 1 Dust Collector 101 and Return System (the “Services”) as described in Exhibits B, “General Construction Specification,” B-1, “Electrical Specification”, B-2, “Mechanical Demo Drawings”, B-3, “Mechanical Reference Drawings” and B-4 “Dust Collector Demo Drawings.”             

Solicitation Documents:

Companies wishing to provide a Response for this Solicitation must download the Collective Document for this Solicitation no later than May 14, 2019 from the website. There is a link for the Collective Document located on the left side of this page, under the “Solicitation Documents.” To successfully download the documents, it is recommended that Google Chrome 33+, Mozilla Firefox 38.01.1, or Internet Explorer 9 or greater be used.

Pre-Solicitation Meeting:

A Non-Mandatory Pre-Solicitation Meeting will be held on May 14, 2019 at 1:30 pm (Central) at JK Spruce Conference Room, 12940 US Hwy 181 South, San Antonio, Texas 78223. This meeting is not mandatory, however, it is highly recommended that the interested Companies attend.

To logistically plan for this meeting, you must advise Dolores Torres-Elizondo by email no later than May 13, 2019, by 2:00 pm (Central). There will be a list of attendees provided to Security, and only individuals/companies on this list will be allowed to attend.

Attendees for the Pre-Solicitation Meeting must bring a current, state-issued photo ID for admittance to the Meeting. For escorting and badging purposes, attendees must check in with Security no later than 1:15 pm (Central) suggested at a minimum 15 minutes prior to meeting start time, dependent on where meeting is held.

Response Due Date:

Responses are due no later than June 12, 2019 at 2:00 pm (Central). CPS Energy reserves the right to reject late Submittals. The Collective Document contains all pertinent information regarding Responses.

Contact Name: Dolores Torres-Elizondo

Contact Email: dtelizondo@CPSEnergy.com