CPS Energy’s offices and customer service centers will be closed on Friday, July 4, 2025, in observance of Independence Day. We will reopen on Monday, July 7, at 7:45 AM. Although our call center will be closed for regular business, we are still open for customers to report natural gas or electric emergencies anytime by calling 210-353-HELP (4357) or 1-800-870-1006. Online services may be conveniently accessed through Manage My Account (MMA).
Merida to Westside
COMMITMENT TO RELIABLE SERVICE
In our effort to continually enhance the reliability of our service, we routinely evaluate our systems and rebuild when needed.
SCOPE OF PROJECT
We are rebuilding an existing single circuit 138 kV transmission (power) line between our Merida and Westside Substations. The transmission line route will be four miles long and begin near the Westside Substation, near the intersection of Ruiz St. and San Joaquin Ave. The line proceeds south and turns east along Ceralvo St. The line then turns north on Cupples Rd. and then turns east on Merida St. to the Merida Substation.
This project involves completely removing and rebuilding the transmission line including foundations, transmission structures (poles) and electrical wires. The existing lattice (webbed) structures will be replaced with steel poles. Customers along Ceralvo St. and Merida St. may experience short unavoidable outages during construction.
ESTIMATED TIMELINE
Construction will begin November 2018. Scheduled completion date is May 2019.
PROJECT UPDATES
02/01/2018: Surveying begins
PROJECT CONTACT
Robin Tarpley, Project Manager
Merida to Westside Transmission Line Rebuild Project
210-353-4536
[email protected]