Saturday, November 9, 2024

  • Time: 7:00 A.M. – 7:00 P.M.
  • Location: IH35 & 410 Interchange near 4111 NE Interstate 410 Loop
  • Zip Code: 78218
  • Scope of Work: CPS Energy contractor UCS  will be erecting new power poles. UCS will also be removing existing powerlines and installing new powerlines.
  • Traffic Control and Notifications: Barricades Unlimited will be providing traffic control at the IH35 & 410 Interchange. Approximately eight 15min. lane closures are expected, uniformed officers will be on site to assist. 
  • Outages: There will not be any outages during this procedure. 
  • Traffic Control Plan has been approved by TXDoT

Sunday, November 10, 2024

  • Time: 6:00 A.M. – 3:00 P.M.
  • Location: IH 37 and S Presa
  • Zip Code: 78223
  • Scope of Work: Pike Electric Overhead Construction crews will be installing and removing a new overhead primary wire crossing IH 37 and S Presa.  
  • Traffic Control and Notifications: Alamo City Public Safety traffic control will be providing traffic control on the North and South bound side on IH 37 with 6 rolling traffic stops lasting up to 15 minutes, uniformed officers will be directing traffic. 
  • Outages: There will not be any outages during this procedure. 
  • Traffic Control Plan has been approved by TXDoT

Sunday, November 10, 2024

  • Time: 7:00 A.M. – 7:00 P.M.
  • Location: IH35 & 410 Interchange near 4111 NE Interstate 410 Loop
  • Zip Code: 78218
  • Scope of Work: CPS Energy contractor UCS  will be erecting new power poles. UCS will also be removing existing powerlines and installing new powerlines.
  • Traffic Control and Notifications: Barricades Unlimited will be providing traffic control at the IH35 & 410 Interchange. Approximately eight 15min. lane closures are expected, uniformed officers will be on site to assist. 
  • Outages: There will not be any outages during this procedure. 
  • Traffic Control Plan has been approved by TXDoT

Saturday, November 16, 2024

  • Time: 7:00 A.M. – 7:00 P.M.
  • Location: IH35 & 410 Interchange near 4111 NE Interstate 410 Loop
  • Zip Code: 78218
  • Scope of Work:  CPS Energy contractor UCS will complete removal and installation of new powerlines.
  • Traffic Control and Notifications: Barricades Unlimited will be providing traffic control at the IH35 & 410 Interchange. Approximately eight 15min. lane closures are expected, uniformed officers will be on site to assist. 
  • Outages: There will not be any outages during this procedure. 
  • Traffic Control Plan has been approved by TXDoT

Sunday, November 17, 2024

  • Time: 7:00 A.M. – 7:00 P.M.
  • Location: IH35 & 410 Interchange near 4111 NE Interstate 410 Loop
  • Zip Code: 78218
  • Scope of Work: CPS Energy contractor UCS will complete removal and installation of new powerlines.
  • Traffic Control and Notifications: Barricades Unlimited will be providing traffic control at the IH35 & 410 Interchange. Approximately eight 15min. lane closures are expected, uniformed officers will be on site to assist. 
  • Outages: There will not be any outages during this procedure. 
  • Traffic Control Plan has been approved by TXDoT

Service Reliability

We are undertaking Service Reliability Conversion Projects to convert our existing overhead electric lines to underground lines for improved electric service reliability. We are undertaking these projects because underground electric lines are generally less susceptible than overhead lines to damage and/or service interruptions due to storms, vehicles, trees, and animals.

These enhancements to our infrastructure are meant to significantly improve the electric service we provide in neighborhoods throughout our service area. Find project-specific information here.  

Planned Outages

Our community continues to grow. As it does, we're enhancing and adding new infrastructure as well as updating and improving current infrastructures. This helps ensure safe, reliable gas and electric service for existing and future customers.  

During infrastructure projects, you may experience temporary power outages that are necessary for our field crews to perform their work safely. We will notify you by phone at least one to two business days before any planned outage to inform you of the outage start time and approximate duration. To help us, contact you promptly, please take a moment to confirm or update your contact information in Manage My Account.

Helpful Information

TEXAS LAW:  
CPS Energy reminds you as of September 2019, the Move Over Slow Down law now includes the requirement to move over or slow down for utility vehicles with flashing lights.
 
Help keep our crews safe. 
 
LINKS: 

Infrastructure Projects