System Maintenance: On Sunday, September 14, 2025, from 1:00 AM to 5:00 AM, our EZ Pay credit card payment processing may not be available; however, you may make a payment by logging in to Manage My Account. You may report an outage online or by calling (210) 353-4357. Visibility to bills in Manage My Account may also not be available during this maintenance.
Omicron Transmission Loop Project
CPS Energy is proposing to replace the existing single circuit 138kV transmission line connecting the CPS Energy Omicron Station to the CPS Energy Rafter Station. Distance is approximately (1.5) miles. In addition, two new transmission structures (poles) will be added.
You may call, write, or email:
CPS Energy
Andres Salgado Alamo,
S&T Project Manager
Omicron Transmission Loop Project
Mail Code RT0801
500 McCullough Ave.
San Antonio, Texas 78215