Omicron New 138kV Transmission Line Project
Project Links
- Omicron Project Open House Invite Letter
- Reunión Pública Carta de Invitación de Proyecto Omicron
- Omicron Project Brochure
- Folleto de Proyecto de Transmisión Omicron
- Map of Omicron 138kV Transmission Line Project (PDF, 1.3MB)
- Omicron Project Open House Displays
- Omicron Project FAQs (English)
- Omicron Project FAQs (Spanish)
- Omicron Project Questionnaire (English)
- Omicron Project Questionnaire (Spanish)
- Map of Omicron Project Map- Northern Portion (PDF, 33.8MB)
- Map of Omicron Project Map- Southern Portion (PDF, 31.2MB)
Reference Materials
CPS Energy proposes to construct an approximate five-mile 138kV transmission line extension to a new substation (Omicron) in the western part of Bexar County. The line extension will loop into the existing Cagnon to Howard Rd. 138kV transmission line.
The proposed project is needed to increase the load-serving capability of the far western portion of the CPS Energy transmission system to accommodate increasing customer load growth in the area, including new large customer loads.
The Electric Reliability Council of Texas (ERCOT) endorsed this project as a needed transmission system improvement on the CPS Energy system on July 26, 2024.
Update 06-27-2025:CPS Energy has filed the CCN Application for the Omicron 138kV Transmission Line Project with the Public Utility Commission of Texas under docket number 58276. The filed application can be found on the PUC Interchange website here. Digital copies of the complete application and attachments are available on this website, and the PUC Interchange. A physical copy of the documents is available for public viewing at:
CPS Energy, 500 McCullough, San Antonio, TX 78215
and
Potranco Branch Library, 8765 TX-151, San Antonio, Texas 78245
Notice packages (Attachment 5) for this project have been mailed out via first class mail to all directly affected Landowners. If you wish to participate in this proceeding by becoming an intervenor, the deadline for intervention in the proceeding is July 28, 2025, and the PUC should receive an electronic filing or letter from you requesting intervention by that date. More information about the PUC’s filing process can be obtained at the PUC’s website here. Instructions for using the PUC Filer are available here. For assistance with an electronic filing, please contact the PUC’s Help Desk at (512) 936-7100 or [email protected].
Update 06-18-2025: CPS Energy have filed for a docket number with the Public Utility Commission of Texas (PUC). The docket number is 58276 and can be found on the PUC Interchange website here.
You may call, write, or email:
CPS Energy
Oscar Luevanos
Project Manager II
Omicron New Transmission Line Project
Mail Code RT0801
500 McCullough Ave.
San Antonio, Texas 78215
(210) 353-6673
[email protected]