Road Closures and Infrastructure Projects

 

Upcoming Road Closures

To maintain the overall health of our infrastructure and utility system, we have to occasionally close roads to perform upgrades, maintenance and replacements.   The road closures below are scheduled but on occasion, we are forced to close roads to make unscheduled repairs to our equipment.

The below schedule and timeline are subject to change.  Thank you for your patience as we work to provide you with safe and reliable electric and gas service.

 

NEW LAW:  CPS Energy reminds you as of September 1, 2019, the Move Over Slow Down law now includes the requirement to move over or slow down for utility vehicles with flashing lights.  Help keep our crews safe. 

The City and County Stay Home Work Safe mandate for San Antonians to stay home exempts utility companies. CPS Energy will not compromise our ability to deliver safe, reliable energy to our customers in this time of need.

 

March 28 & 31, 2020

Time Frame:   

  • Saturday, March 28 through Sunday, March 29, 2020  7:30 a.m. – 8:00 p.m.
  • Monday, March 30 through Tuesday, March 31, 2020  9:00 a.m. – 4:00 p.m.

Location:

  • On SE Loop 410 approximately 0.6 miles west of the intersection of SE Loop 410 & Southton Rd.
  • MAP IT

Scope of Work:

  • As required by TxDOT, off-duty law enforcement officers will provide traffic control to help drivers safely reach their destination.
  • In support of a current substation project, CPS Energy contractors plan to replace overhead electric lines spanning across SE Loop 410. This work will require temporary lane closures affecting drivers traveling in both directions of SE Loop 410 near the job site. The lane closures are coordinated with the Texas Department of Transportation (TxDOT) and are needed to ensure driver and crew safety.
  • To maintain the overall health of infrastructure and the utility system, CPS Energy occasionally closes roads to perform upgrades, maintenance and replacements. Lane closures are expected to last no more than 15 minutes each. A rolling roadblock, also known as a temporary road closure, rolling block, pacing operation, or traffic pacing, is a common highway traffic control technique used to temporarily slow or stop traffic upstream of construction, maintenance, and utility work activities requiring a short-term full closure of the roadway and or lanes.
  • No residential or commercial power interruptions are expected in the area because of this work.

Sunday April 5, 2020

  • Time Frame: 7:00 AM – 3:00 PM
  • Location:  IH10 at Fredericksburg Rd
  • Scope of Work: System Improvement
    • CPS Energy Contractor, Chain Electric, will be replacing an overhead electric distribution crossing
    • Eight rolling highway closures from the southbound access road of IH10 at Fredericksburg Rd. over the highway to the northbound access road of IH 10 at Fredericksburg Rd.
    • Traffic will be stopped on the upper and lower level during the 8 stops (5-15 min) 
    • Two Message Boards will be placed per TxDOT request on Sunday March 29, 2020
 

Planned Outages

Our community continues to grow. As it does, we're enhancing and adding new infrastructure as well as updating and improving current infrastructures. This helps ensure safe, reliable gas and electric service for existing and future customers.  

If there will be a planned power outage in your area, we will work to provide sufficient notice via mail 30 days prior to the planned outage and a phone call the day before.  To help us contact you promptly, please take a moment to confirm or update your contact information in Manage My Account.

Planned outages are scheduled for the following zip codes for the first quarter of 2020:

78249  78250  78240  78218  78257  78254  78247  78230  78239  78248  78231

78216  78251  78148  78217  78232  78222  78245  78256  78229  78109