Legend Falls Substation & Transmission Line Project
Project Links
- Customer Information Letter (English)
- Customer Information Letter (Spanish)
- Project Brochure (English)
- Project Brochure (Spanish)
- Project Questionnaire (English)
- Project Questionnaire (Spanish)
- Project FAQs (English)
- Project FAQs (Spanish)
- Legend Falls Project Displays
- Legend Falls Project Map North
- /content/dam/corporate/en/Documents/Infrastructure/LegendFalls_CoordinationMap_South20251006_ada_123025.pdf
CPS Energy is proposing to construct a new 138 kV substation and approximately two miles of new 138 kV transmission corridor in Medina County. The proposed transmission lines will require new Right of Way (ROW). One double-circuit transmission line will connect the new substation to the CPS Energy transmission system and the other single-circuit transmission line will connect the CPS Energy substation to the STEC San Geronimo substation.
You may call, write, or email:
CPS Energy
Cody Lansford
Project Manager
Legend Falls Substation & Transmission Line Project
Mail Code RT0801
500 McCullough Ave.
San Antonio, Texas 78215
(210) 353-2363
[email protected]