Legend Falls Substation & Transmission Line Project

 
 

CPS Energy is proposing to construct a new 138 kV substation and approximately two miles of new 138 kV transmission corridor in Medina County. The proposed transmission lines will require new Right of Way (ROW).  One double-circuit transmission line will connect the new substation to the CPS Energy transmission system and the other single-circuit transmission line will connect the CPS Energy substation to the STEC San Geronimo substation.

You may call, write, or email: 

CPS Energy 
Cody Lansford
Project Manager
 
Legend Falls Substation & Transmission Line Project 
Mail Code RT0801
500 McCullough Ave.
San Antonio, Texas 78215
(210) 353-2363
[email protected]