Cagnon to Howard Transmission Line Project

 
 

CPS Energy, along with our contractor Chain Electric and their subcontractors, will be working on the 345kV Electric Transmission Line as part of the Cagnon to Howard 345kV Rebuild Project. The Project includes installing thirty-five (35) foundations with tubular steel monopoles, replacing 26 miles of wire, and the removal of 16 lattice towers. All work will be utilizing CPS Energy's existing easement Transmission lines consist of various materials (wood, concrete, steel, etc.) and wires that move electricity long distances at high voltages from station to station.