Braunig to Highland Hills Project

 

The Braunig to Highland Hills Project consists of replacing an estimated 6.9-mile segment of the Braunig to Highland Hills 138 kV transmission line. This infrastructure rebuild will replace existing transmission line with new transmission line structures and conductors from S.E. Military Dr. to the Braunig Switchyard. To start off this rebuild project, CPS Energy has contracted The University of Texas at San Antonio to complete soil sampling within the transmission easement. Those residents that have the transmission line crossing their property will be notified of the soil sampling. All other area residents will receive additional correspondence regarding more details of the project.